S6065
Introduce the best quality, best service, and best practices of SEYANG

Long experience and technology


Optimizing the processing time


Big data system


Thorough follow-up maintenance
Specification Diagram

- 1.Accumulator
- 2.First Water Supply (Loading Conveyer)
- 3.Second and Third Water Supply
- 4.Drying section (Ring Blower)
- 5.UV sterilization Unit (Align)
- 6.Inspection Unit (Crack Detector)
- 7.Crack Detector
- 8.Transfer, Weigh on Scale
- 9.Main Frame
- 10.Abnormal Egg Detection Unit CPU
- 11.Packer (Auto)
- 12.Elevator, Mold Dispenser
- 13.Non-gradable Eggs (Hand Pack)